Subfloor Preparation : All substrates must be clean, dry, structurally sound, properly cured and free of dirt, oil, paint, old adhesive, wax, sealers and curing agents. For installation of wood flooring products (engineered, solids, bamboo and laminate and resilient floors), the subfloor must be flat to a tolerance of 3/16” in a 10’ radius.