Project Management Using Earned Value by Gary C. Humphreys (2002, Hardcover)

1 product rating
4.0average based on 1 product rating
  • 5

    0
  • 4

    1
  • 3

    0
  • 2

    0
  • 1

    0

Pre-owned: lowest price

$8.63

Free Shipping
  • Get it by Wed, Aug 21 - Wed, Aug 28 from ThriftBooks Warehouse, United States
  •  • Good condition
  •  • 30 day returns - Free returns
A copy that has been read, but remains in clean condition. All pages are intact, and the cover is intact. The spine may show signs of wear. Pages can include limited notes and highlighting, and the copy can include previous owner inscriptions. The dust jacket is missing. At ThriftBooks, our motto is: Read More, Spend Less.
Project Management Using Earned Value by Gary C. Humphreys A copy that has been read, but remains in clean condition. All pages are intact, and the cover is intact. The spine may show signs of wear. Pages can include limited notes and highlighting, and the copy can include previous owner inscriptions. The dust jacket is missing. At ThriftBooks, our motto is: Read More, Spend Less.
Sold bythrift.books (1646801)99.3% Positive feedbackContact seller

Project Management Using Earned Value by Gary C. Humphreys (2002, Hardcover)

Pre-owned: lowest price

$8.63

Free Shipping