Project Planning and Control Using Primavera P6 : For All Industries Including Versions 4 To 6 by Paul E. Harris (2008, Paperback)

1 rating
5.0average based on 1 ratings
  • 5

    1
  • 4

    0
  • 3

    0
  • 2

    0
  • 1

    0

$129.00Free shipping
Brand New
Est. Aug. 22 - Sep. 8 deliveryFrom Los Angeles, California